Jhapa Solar PV Project
utility

Jhapa Solar PV Project

A utility-scale solar plant developed across 15.57 hectares, comprising 22,232 solar modules and two 5 MVA inverters. Connected directly to the NEA 33 kV grid infrastructure.

LocationShivasatakshi, Jhapa
Parameters12 MWp
ExecutionCompleted (2023)
Beldiya Solar Project
utility

Beldiya Solar Project

A grid-connected utility solar PV development engineered to generate over 20 GWh of clean electricity annually, stabilizing regional grid loads.

LocationNawalpur
Parameters12 MWp
ExecutionOngoing
Butwal Solar PV Project
utility

Butwal Solar PV Project

Large-scale generation plant spanning 17.2 hectares with 31,280 advanced solar modules. Power evacuated systematically via the 33 kV Amuwa Substation.

LocationTillottama, Rupandehi
Parameters8.5 MW
ExecutionCompleted
Janaki Solar Project
utility

Janaki Solar Project

An ongoing grid-connected infrastructure project expected to generate over 10 GWh annually, reducing baseline transmission stress in western zones.

LocationBanke
Parameters6 MWp
ExecutionOngoing
Dabur Nepal Pvt. Ltd. Solar Setup
rooftop

Dabur Nepal Pvt. Ltd. Solar Setup

Features a 736 kWp active rooftop system yielding ~1,010 MWh annually, with a 240 kWp ground-mounted auxiliary array currently under system implementation.

LocationJeetpur Simara
Parameters976 kWp
ExecutionPartially Completed
College of Medical Sciences Solar
rooftop

College of Medical Sciences Solar

Engineering and design of a high-capacity institutional rooftop framework expected to generate 682,460 kWh annually for medical operations.

LocationBharatpur, Chitwan
Parameters500 kWp
ExecutionOngoing
Hotel Holiday Inn Express Rooftop
rooftop

Hotel Holiday Inn Express Rooftop

A premium grid-connected commercial array generating roughly 88,351 kWh annually, yielding significant operational savings for the hospitality asset.

LocationNaxal, Kathmandu
Parameters60 kWp
ExecutionCompleted (2026)
Galaxy Garden Resort Solar
rooftop

Galaxy Garden Resort Solar

A targeted rooftop deployment engineered to produce 169,755 kWh annually, optimized for a calculated financial payback period under three years.

LocationBharatpur
Parameters100 kWp
ExecutionOngoing
Shanta Complex Solar Plant
rooftop

Shanta Complex Solar Plant

High-density urban rooftop engineering generating 73.81 MWh annually, mitigating long-term peak electricity tariffs within a commercial hub.

LocationPutalisadak, Kathmandu
Parameters50.7 kWp
ExecutionCompleted (2024)
33 kV Transmission Line (Butwal)
grid

33 kV Transmission Line (Butwal)

Full structural route mapping, easement advisory, and physical development of a 33 kV single circuit link for total integration of the solar asset.

LocationButwal Power Plant
ParametersSingle Circuit
ExecutionCompleted
33 kV Bay — Amuwa Substation
grid

33 kV Bay — Amuwa Substation

Turnkey advisory and technical delivery of a dedicated 33 kV substation bay layout, enabling secure power evacuation across vulnerable geographical basins.

LocationTinahu River Basin
ParametersSubstation Bay
ExecutionCompleted
33 kV Beldiya–Mukundapur Line
grid

33 kV Beldiya–Mukundapur Line

Structural engineering design, clearance configuration, and transmission network layouts connecting the Beldiya Solar arrays to the NEA Substation.

LocationNawalpur Corridor
Parameters5.6 km Grid
ExecutionCompleted